Home> Products> Fired Heater> Hydrogen Production Plant Hydrogen Plant H2 Plant
Hydrogen Production Plant Hydrogen Plant H2 Plant
Hydrogen Production Plant Hydrogen Plant H2 Plant
Hydrogen Production Plant Hydrogen Plant H2 Plant

Hydrogen Production Plant Hydrogen Plant H2 Plant

Payment Type:T/T

Incoterm:FOB,CFR,CIF,EXW

Min. Order:1 Set/Sets

Transportation:Ocean

Port: Shanghai

Product Description
Product Attributes

Model No.Hydrogen producing reformer

Place Of OriginChina

Megawatt5-50 MW/ unit

Applicationpetrochemical industry

NameHydrogen producing reformer

Design Temperature900-1100℃

Supply Ability & Additional Information

PackagingModules are shipped in bulk/packaged

TransportationOcean

Supply Ability25000Nm³/h

Port Shanghai

Payment TypeT/T

IncotermFOB,CFR,CIF,EXW

Packaging & Delivery
Selling Units:
Set/Sets
Package Type:
Modules are shipped in bulk/packaged

Hydrogen Production Plant  Hydrogen Plant H2 Plant



Product introduction



The alkanes in natural gas under the appropriate pressure and temperature, a series of chemical reactions will occur to generate conversion gas, conversion gas after heat transfer, condensation and other processes, so that the gas under automatic control through various adsorbent PAS device, carbon monoxide, carbon dioxide and other impurities are adsorbent tower adsorption, Hydrogenation Project,Hydrogen Production Eguipment,Heating Furnace Equipment hydrogen is sent to the gas device, adsorbent impurities, adsorbent. After desorption, the analytical gas can be sent to the converter as fuel, and the adsorbent is also regenerated.


Hydrogen Producing Reformer 1



Product parameter

Name: Hydrogen producing reformer

Application: petrochemical industry

Design temperature: 900-1100℃

Megawatt: 5-50 MW/unit

Specification::Cylinder diameter 2-8 meters

The square can be customized in length, width and height



Note:

1, before opening the furnace should be furnace tube, parts, ancillary equipment, process pipelines, instruments and other instruments for a comprehensive inspection, confirm the process is correct, all equipment and parts intact, equipment and pipelines without debris, instruments and instruments flexible and convenient operation, real and accurate data;

2. Steam through the process pipeline and equipment of the furnace system to ensure smooth process flow. When all checks are qualified, the fuel gas line shall be completely replaced with nitrogen and then introduced to the fuel gas line. When fuel gas is introduced, pay attention to the oxygen content of air in the pipe <1%. Before ignition, the content of combustible gas in the fuel gas pipeline is detected, and the ignition operation is carried out after the ignition conditions are met.

3. Use steam stoves in strict accordance with operating rules;

4, heating, close the steam valve, such as furnace and pressure, must be able to wait for the pressure to zero inch after the pot (box) to take.


Compared with other companies, the advantages of our products are: good thermal insulation effect, high thermal efficiency, good energy saving effect, low smoke exhaust temperature, adjustable dilution ratio, good selectivity, less high boiling substance; Emission standards, small pollution, small footprint.


Product process: blanking, assembly, welding, testing, anti-corrosion, installation, commissioning.




Hot Products
Home> Products> Fired Heater> Hydrogen Production Plant Hydrogen Plant H2 Plant
Send Inquiry
*
*

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send